Menu

IT Services – Service Status

Service status menu

Resolved: Scheduled: Network Switch Proactive Maintenance Reload – Monday 31st January, from 05:30am to 06:20am GMT- Mile End Campus (West of Queens’ Building)

Monday, 31 January 2022, 5.30 - 6.20am

Summary

Campus/Building:West of Queens’ building

Maintenance Duration: 50 minutes

Impact to users and services affected:  As part of a pro-active maintenance schedule, IT Services need to reload the network switches responsible for providing local network connectivity to end user devices (PCs, IP Phones, and Wireless Access Points etc.)

University Data Centres, Core Network and Internet Connectivity are not affected by this work.

These reloads will cause a brief interruption to local services (maximum 10 minutes) and have been scheduled to minimise inconvenience to staff & students. All reloads will be completed between 05:30 am and 06:20 am GMT on Mile End Campus (West of Queens’ Building).

We apologise for any inconvenience caused during this time.

IT Services | CH/16604|